Allelys Move 48m Bridge Beam from inside of factory to outside
Priest Abnormal Load Services Priest Abnormal Load Services
3.33K subscribers
4,831 views
58

 Published On Jun 15, 2021

In this video we assist Allelys Heavy Haulage with the loading, internal movement and unloading of a 48m long double braced bridge beam.
The beam was loaded off stools inside the factory and moved & unloaded outside for short term storage.

The beam was loaded on 2x Goldhofer Bogies equipped with turntables. The front bogie being a 4 axle and the rear a 6 axle. A MAN TGX 680 V8 ballast tractor provided the traction.

Trailer Operations & Video©️
www.priestabnormalloadservices.com

show more

Share/Embed