Preventing groundwater contamination in the Sarasota Landfill expansion with BENTOLINER & GSE
Solmax Solmax
844 subscribers
262 views
1

 Published On Sep 26, 2024

The Sarasota landfill expansion project utilized a dual-liner system featuring a dual-liner system with BENTOLINER® geosynthetic clay liner (GCL) and GSE® HD geomembrane liner. This system ensured groundwater protection and regulatory compliance.
The installation was completed on a tight schedule, showcasing our commitment to efficient and sustainable waste management.

Key highlights:
• Dual-liner system: Featuring BENTOLINER GCL and GSE HD geomembrane for superior environmental protection.
• Groundwater protection: Prevents contamination, safeguarding local water resources.
• Regulatory compliance: Meets all environmental regulations for sustainable landfill management.
• Time-sensitive installation: Efficient project execution to meet tight deadlines.
• Expert collaboration: HDR Engineering and Glover Construction deliver top-notch engineering and construction solutions.

This video highlights the importance of timely execution and showcases how the project not only met but exceeded stringent environmental standards. Witness the collaborative effort that made the Sarasota landfill expansion a model of modern engineering and environmental stewardship.

Watch as we dive into the details of this project that highlights the importance of timely execution and showcases how the project not only met but exceeded stringent environmental standards.

show more

Share/Embed